The floor coating, Sikagard 62, was applied with a smooth finish under the machine to make cleaning easier, and with a non-skid aggregate around the perimeter.
The trench, sump pit hatch, and support pads also received 2 coats of epoxy.
After the slab passed moisture vapor emission testing , the 3100 SF job was completed in 3 days without a hitch, and the results look great!